A laboratory’s layout has a direct effect on how people work. Choosing a fume hood deserves the same attention. A unit that looks suitable on a floor plan may create problems once researchers begin using it.
Size and placement are closely connected. The decision should account for the laboratory’s activities, equipment requirements and available infrastructure. Choosing the right arrangement early helps laboratory planners avoid costly changes later.
Start With the Work, Not the Available Wall Space
Start by understanding what will happen inside the fume hood. List the procedures, chemicals and equipment that researchers expect to use.
This assessment helps establish the internal working area required. A fume hood used for routine transfers has different needs from one that accommodates tall distillation equipment or larger apparatus.
Consider the following
-
The size and number of items used during a typical procedure.
-
The space required to position glassware, instruments and containers.
-
Whether work involves heat, corrosive substances or specialised processes.
-
The need to keep frequently used materials within reach without overcrowding the work surface.
Match the enclosure to the work.
Choose a Type That Suits the Application
Different procedures call for different configurations. Kewaunee offers several options, including benchtop, distillation, floor mounted, radioisotope and perchloric acid models.
A benchtop unit suits work carried out on a laboratory bench or above a storage cabinet. Distillation models provide room for taller apparatus. Floor mounted or walk-in, models accommodate large equipment and containers which cannot fit inside a standard bench unit.
Specialised work requires closer attention to construction and materials. For instance, Kewaunee’s perchloric acid model has a coved, seamless stainless steel interior. Radioisotope models are intended for beta and gamma radiation environments.
The choice should follow a review of the process and its hazards. A general purpose model isn’t automatically suitable for every chemical or procedure. Confirm the required configuration with the laboratory safety team and equipment supplier before finalising the specification.
Measure the Room Before Finalising the Size
Once the application is clear, measure the proposed location. Record the available wall length, room depth, ceiling height and access routes.
Check the space needed for installation and future servicing. The unit shouldn’t obstruct walkways, emergency equipment or access to other workstations.
Allow for the services and connections required by the selected model, including exhaust ductwork, electrical points, plumbing and other specified utilities. Coordinate these requirements with the mechanical and electrical teams early.
Place It Away From Airflow Disturbances
A well sized unit still performs poorly if the surrounding room disrupts its airflow. Avoid placing it where frequent movement, open doors or supply air diffusers create strong air currents across the front opening.
Keep the location away from busy walkways and entrances where practical. People passing close to the working face disturb containment. Doors opening nearby create similar problems. Give users enough room to work while limiting traffic around the enclosure.
Coordinate placement with the building’s ventilation design. The exhaust system, make-up air and room air supply must work together. Changes to ceiling diffusers, room pressure or exhaust arrangements should be reviewed by the relevant engineering team.
Check Visibility, Access and Daily Movement
Researchers need a clear view and enough space to operate the sash and controls. Place the unit where users approach it comfortably without crossing busy routes or blocking access to shared equipment.
Think about the complete work sequence. Where will chemicals be collected? How will materials reach the enclosure? Where will used glassware go? A sensible arrangement reduces unnecessary movement and helps keep the work area organised.
Don’t position the unit where it blocks windows, emergency exits, safety showers or eyewash stations. These facilities must remain accessible.
Review Ventilation and Performance Requirements
Before installation, confirm that the selected model and its exhaust arrangement suit the planned work. Kewaunee’s Venturi fume hoods are designed and tested to meet ASHRAE 110-2016 and EN 14175-3 requirements. The project team should still verify the specifications, installation conditions and testing requirements for the particular laboratory.
After installation, arrange the required commissioning and performance checks. Review airflow and containment under the conditions in which the enclosure will be used. Train users on correct sash position, operating practices and the limits of the equipment. Good placement supports safe use, while proper operation and maintenance remain essential.
Conclusion
Choosing the right laboratory enclosure involves more than matching dimensions to an empty wall. The work, equipment, room layout, airflow and user movement all need attention. Assessing these factors together helps avoid space conflicts and supports reliable containment. Kewaunee offers standard and customized options for different laboratory applications, with solutions selected around the work and available space.
Speak with Kewaunee’s team to identify a suitable fume hood configuration for your laboratory and discuss your project requirements.
Kewaunee, the global leader in total laboratory solutions, empowers organisations to achieve competitive advantage through safe, efficient, and contemporary laboratories. In existence since 1906, Kewaunee powers the laboratories for over 5,000 customers in more than 100 countries.
